Data Dictionary

Field Name Name Type Description Fixed Values
Year Year (Metropolitan Tram) INT Year on which services are run None
Month Month (Metropolitan Tram) TEXT Month on which services are run None
Line Line (Metro Tram) TEXT Line on which services are run None
% public punctuality (MR5) Public Reporting Punctuality Result DOUBLE A / B Where A = is the total number of Punctuality Monitoring Points at or from which Operated Services are Punctual in the relevant Reporting Period; and B = is the total number of Punctuality Monitoring Points at or from which Operated Services arrive or depart in the relevant Reporting Period. None
% public reliability (MR5) Public Reporting Reliability Result DOUBLE A / B Where A = is the total number of Reliability Monitoring Points at or from which Operated Services arrive or depart in the relevant Reporting Period; and B = is the total number of Reliability Monitoring Points at or from which Scheduled Services are scheduled to arrive or depart in the relevant Reporting Period; and None
# punctuality monitoring point (delivered|Ontime) Public Reporting Delivery Monitoring Point Ontime INT Any incident of a Master Timetable Service that is a Timetabled Service both: (a) arriving at a Public Reporting Punctuality Monitoring Point at which it is scheduled to arrive in the Master Timetable and Daily Timetable no later than 4 minutes and 59 seconds after the time it was scheduled to do so in the Daily Timetable; and (b) departing from that Public Reporting Punctuality Monitoring Point no earlier than 59 seconds before the time it was scheduled to do so in the Daily Timetable. None
# punctuality monitoring points (delivered) Public Reporting Delivery Monitoring Point INT In relation to a service, each of the monitoring points identified as a public reliability monitoring point in the operating contract. There are generally five of these points on each route, two near the origin and destination and one near the middle of each route. None
# reliability monitoring points (delivered) Public Reporting Reliability Monitoring Point (Delivered) INT Count of the number of monitoring points at or from which an Operated Service arrived or departed None
# reliability monitoring points (scheduled) Public Reporting Reliability Monitoring Point (Scheduled) INT Count of the number of monitoring points at or from which an Operated Service is scheduled to arrive or depart None

Additional information

Field Value
Format CSV
License Creative Commons Attribution 4.0
Open Data Title Metro Tram Operational Performance (MR5) by Line
Dataset File Size 27.4 KiB
Dataset Security Value BIL1 OFFICIAL - Authorised Public Release
Dataset Reporting Period Start 1 December 2024
Dataset Reporting Period End 31 October 2026
Geographic Coverage Metropolitan Melbourne